May 7
Bid ended

GRAND COURT GENERATOR REPLACEMENT PROJECT

Remodel
This work is to include replacing the existing natural gas generator and transfer switch with new. This work also includes rewiring existing exit lighting, interior corridor, and exterior egress lighting to comply with the lates codes.

Status

Bidding Closed

Prebid Date4/23/24 8:00am

Bid Date5/7/24 9:00am

Company & Contacts

MSA Professional Services Inc
Dave Schulze  
920-894-4710

Location

Fond du Lac WI.

*** SAVE BIG ON SAME DAY PRINT ORDERS! JUST $20 for a Full Set of Plans! (without specs)


Please submit bids/proposals to The Fond du lac Housing Authority as indicated in the Spec Manual.

PRE-BID MEETING: MSA Professional Services will be performing a one-time mandatory pre-bid walkthrough for all contractors bidding on this project. This walkthrough will be performed at Grand Court Apartments on Tuesday, April 23, 2024, at 8:00 a.m. All contractors shall meet in the main lobby of Grand Court Apartments.


It is the bidder’s sole responsibility to review the “Addenda” tab during the bidding process for new postings!

The Owner, Architect, General Contractor, Printer, or PlanRoom will not be responsible for bids or sub-bids based on single drawings, specification sheets or observation or use of partial sets of documents. It is the bidder’s sole responsibility to review & understand all project requirements prior to submitting a bid!

Planroom Help? eMail support@blueprintfdl.com or call 920-922-3592.