Apr 9
Bid ended

GROVE CAMPUS INTERIOR TOILET ALTERATIONS | Evansville School District

The project consists of two (2) toilet room renovations approximating 230 square feet, within an existing intermediate school. Demolition and replacement of plumbing fixtures. Finish upgrades include ceramic tiling, phenolic toilet partitions, acoustical panel ceiling, painting, toilet accessories, flush wood doors and hollow metal frames.

Status

Bidding Closed

Prebid Date4/1/21 9:00 am

Bid Date4/9/21 12:00 pm

Company & Contacts

Bray Associates Architects

Andrew Iverson: aiverson@brayarch.com   414.226.0200

Location

410 South 3rd Street, Evansville WI.

Please Submit Bids to The OWNER as indicated in the Spec Manual.

PRE-BID CONFERENCE:
A pre-bid conference will be held at the District Office Conference Room located at 340 Fair Street, Evansville, Wisconsin on Thursday, April 1st, 2021 at 9:00 AM. Attendance is highly encouraged for all bidders. Face masks are required, and social distancing will be observed during the walk-through.

• Paper Copies, Downloads, & UPS Ground Shipping ($24.95) are available for a non-refundable purchase only!

Addenda may be issued as part of this bid package; it is the bidder’s sole responsibility to review the “Addenda” tab during the bidding process for new postings!

The Owner, Architect, General Contractor, Printer, or PlanRoom will not be responsible for bids or sub-bids based on single drawings, specification sheets or observation or use of partial sets of documents. It is the bidder’s sole responsibility to review & understand all project requirements prior to submitting a bid!

Planroom Help? eMail support@blueprintfdl.com or call 920-922-3592.