UW Stevens Point Collins Classroom Ctr Sentry Hall Addtn & Modernization
Status
Accepting Bids
| Prebid Date | 1/21/26 10:00am |
| Sub Bid Date | 2/12/26 1:00pm |
| Bid Date | 2/26/26 1:00pm |
Company & Contacts
Location
Stevens Point, WI.
Please Submit Bids to The OWNER as indicated in the Spec Manual.
PRE-BID CONFERENCE: A non-mandatory pre-bid tour will be conducted at the site January 21, 2026, beginning at 10AM. Participants should meet in the main north lobby of the Collins Classroom Center Building located at 1801 4th Avenue, Stevens Point, WI 54481. All bidders are highly encouraged to attend this Prebid Conference / Building Tour and no separate tours will be conducted. The contact person is Shannon Miller, AIA at Aro Eberle Architects, Inc., Telephone: (608) 204-7464.
BID SUBMISSION for AAC Bidders DUE by 1:00PM FEBRUARY 26, 2026.
DESCRIPTION: In general, the work consists of: a complete modernization and addition to the Collins Classroom Building, to be renamed as Sentry Hall, (107,332 gross square feet) creating a new technology-rich home for the University of Wisconsin – Stevens Point Sentry School of Business and Economics. The project is locate at 1801 Fourth Avenue, Stevens Point, Wisconsin. Demolition of most of the interior, non-load bearing partitions, a portion of the building concrete structure, the entire penthouse, a portion of the slab on grade, and the entire building envelope will occur. The project will construct new additions on the west and south side of the building as well as a new penthouse, to provide accessibility to the building and maximize needed office, classroom, and student study spaces within the building. All building infrastructure systems (mechanical, electrical, telecommunications, and plumbing) will be removed and replaced in their entirety, and a new fire suppression system and emergency power generator will be installed. A new connection to central campus chilled water and steam utilities, and campus fiber optic network will be constructed. Two new modern ADA-compliant elevators capable of accommodating a stretcher will be installed in new shafts. The entire exterior envelope, including back-up will be replaced, including energy efficient and bird friendly glazing. The current roofing system will be replaced, and roof insulation added. New light monitors will be installed in the fourth-floor slab, providing daylight to the interior classrooms below. The building’s four existing entries will be improved, and the site regraded to provide accessibility at all entries. The improved landscape will provide a feature for storm water detention and better incorporate into the campus’ landscape design.
• It is the bidder’s sole responsibility to review the “Addenda” tab during the bidding process for new postings!
• The Owner, Architect, General Contractor, Printer, or PlanRoom will not be responsible for bids or sub-bids based on single drawings, specification sheets or observation or use of partial sets of documents. It is the bidder’s sole responsibility to review & understand all project requirements prior to submitting a bid!
Planroom Help? eMail support@blueprintfdl.com or call 920-922-3592.
