Public Projects

Bids due in 4 days
11/4/25 9:00am
Grand Court Apartments Kitchen Lighting Replacement Project
Bids due in 4 days
Fond du Lac Housing Authority
630 W Arndt Street, Fond du Lac WI 54935.
Mechanical
This work is to include replacing the exiting fluorescent kitchen light with a surface LED type in 31 living units in the two-story apartment building.
Bids due in 6 days
11/6/25 1:00pm
Governor Dodge State Park Road & Campground Improvements
Bids due in 6 days
State of WI, Department of Administration, Division of State Facilities
Dodgeville, WI
Site Work
In general, the work consists of: This project will repave portions of multiple roads and parking areas throughout Governor Dodge State Park. Repaving includes: Ridge Road from Twin Valley Road to Cox Hollow Road, Hickory Ridge Road and parking areas, Enee Point Parking Lot, and the Cox Hollow Boat Launch. This project will also replace aging and failing waterlines in the Twin Valley Campground, and construct a new parking area as part of this project at Smith Conley Creek, south of the park on CTH H.
Bids due in 6 days
11/6/25 2:00pm
Horicon WWTF
Bids due in 6 days
C.D. Smith Construction
Horicon WI.
Remodel
Upgrades to the wastewater treatment process.
Bids due in 13 days
11/13/25 1:00pm
Potawatomi State Park Paving & Utilities Replacement
Bids due in 13 days
State of WI, Department of Administration, Division of State Facilities
Town of Nasewaupee, WI
Site Work
In general, the work consists of: site clearing and grubbing, pulverizing asphalt pavement, removing asphalt pavement, excavation, rock excavation, grading, removing and replacing culvert pipes, installation of seasonal water service line, connections of water service line to existing pump, installation of new water pressure pump and treatment system, placing base course material as necessary for excavation below subgrade, placing base aggregate and asphalt pavement, pavement marking, permanent signing, site restoration, and other miscellaneous items of work.
Bids due in 13 days
11/13/25 2:00pm
FDL County Park Dump Station Relocation Waupun WI
Bids due in 13 days
FdL County Gov
Fond du Lac WI.
New Construction
Fond du Lac County is seeking qualified contractors to provide all labor, materials, and equipment necessary for the construction and relocation of the dump station at Waupun County Park located at 825 County Park Road, Waupun, WI 53963. This project consists of installing a new RV sanitary dump station, including approximately 100 linear feet of 4-inch PVC sanitary sewer, 230 linear feet of 1¼ - inch HDPE water service, and associated connections, fittings, and site restoration.
Bids due in 18 days
11/18/25 2:00pm
CVTC BEC Lower Level Faculty Offices Eau Claire WI
Bids due in 18 days
Market & Johnson - Eau Claire
620 W Clairemont Ave, Eau Claire WI 54701
Remodel
In general, the project consists of demolition and remodeling of 5500sf of existing kitchen and bathrooms into new offices, conference rooms, and bathrooms. This includes finish upgrades and related work to mechanical, electrical, and plumbing.
Bids due in 20 days
11/20/25 1:00pm
Hill Farms State Office Building 7th Floor North Remodel
Bids due in 20 days
State of WI, Department of Administration, Division of State Facilities
Madison, WI
Remodel
In general, the work consists of: Interior renovation to 9,100 square feet. Demolition of drywall partitions with doors and hollow metal frames. Other work includes plywood monitor mounts, removal and reinstallation of plastic laminate casework with modifications, acoustic ceiling system modifications to accommodate new layout and access work above ceiling. Partitions are metal stud and drywall with wood doors in hollow metal frames with glass lites. Finish work includes wall base, carpet tiles, corner guards, casework modifications, and ceiling tiles. Electrical removal and installation of power and data sensors to accommodate renovation layout. Ceiling work includes removal and reinstallation or new light fixtures, exit lights, occupancy sensors, fire alarms, smoke detectors. Mechanical work includes duct and piping modifications, new VAVs equipment, relocation or new supply diffusers and return grilles. Fire protection work is piping modifications, removal and relocation of sprinkler heads, new sprinkler heads to accommodate renovation layout.
Bids due in 20 days
Sub Bid: 11/6/25 1:00pm
Bid: 11/20/25 1:00pm
UW Stevens Point 4th Avenue Corridor Utility Replacement
Bids due in 20 days
State of WI, Department of Administration, Division of State Facilities
Stevens Point WI.
Site Work
In general, the work consists of: replacing approximately 1000 lineal feet of underground steam and pumped condensate lines and four new steam pits. Steam and pumped condensate laterals to Champions Hall, Science Building, and CPS will be upgraded. Install approximately 1200 lineal feet of primary and signal duct bank along side existing duct bank distribution system. Extend existing underground chilled water distribution system for approximately 900 lineal feet, upgrade chilled water lateral to CPS.
Bids due in 20 days
Sub Bid: 11/6/25 1:30pm
Bid: 11/20/25 1:30pm
UW Madison Babcock Hall Center for Dairy Research Plant Upgrades
Bids due in 20 days
University of Wisconsin System Administration (UWSA)
Madison WI.
Remodel
In general, the work consists of Contractor to procure, install and commission equipment, piping and instruments as outlined in the Contract Documents to provide new utility services to support existing aseptic dairy line equipment within Room 280 of the CDR. The new aseptic equipment is existing within Room 280 of CDR but will require final placement and alignment by the Contractor within the room based upon the Contract Documents. Utility systems to be provided will include a new Reverse Osmosis System, new Culinary Steam System including feedwater tank with pumps, electric boiler, blowdown system and Culinary Steam Filter Station. Culinary Steam will be distributed through both a low pressure and high-pressure culinary steam header to the aseptic equipment. Also included is a 10ºC closed loop chilled water system with a new plate and frame heat exchanger and pump, and a hot water distribution system including a steam shell and tube heater and distribution piping. Campus steam is used as the heating source for the hot water system and the campus ice water system is used as the cooling source for the 10ºC chilled water loop. All new utility equipment will be located in the 3rd floor penthouse area, directly above Room 280 and an interstitial space in between the two areas.
Bids due in 33 days
Sub Bid: 11/18/25 1:00pm
Bid: 12/3/25 1:00pm
UW Green Bay Central Heating Plant & Distribution Renovations
Bids due in 33 days
State of WI, Department of Administration, Division of State Facilities
Green Bay WI.
Mechanical
In general, the work consists of: installation of (2) new 1400 ton electrical water cooled chillers within Central Plant along with associated cooling towers, pumps, controls, piping and miscellaneous mechanical, electrical and plumbing equipment.