Jan 29
Bids in
14 days

UW Green Bay Central Heating Plant & Distribution Renovations

Mechanical
In general, the work consists of: installation of (1) new 1400 ton electrical water cooled chiller within Central Plant along with associated pumps, controls, piping and miscellaneous mechanical, electrical and plumbing equipment.

Status

Accepting Bids

Sub Bid Date 1/14/26 1:00pm
Bid Date 1/29/26 1:00pm

Company & Contacts

State of WI, Department of Administration, Division of State Facilities
Kate Gloede  
608-261-7758

Location

Green Bay, WI.

Please Submit Bids to The OWNER as indicated in the Spec Manual.

PRE-BID CONFERENCE: There will be no pre-bid walkthrough on this project.

DESCRIPTION: In general, the work consists of: installation of (1) new 1400 ton electrical water cooled chiller within Central Plant along with associated pumps, controls, piping and miscellaneous mechanical, electrical and plumbing equipment.


It is the bidder’s sole responsibility to review the “Addenda” tab during the bidding process for new postings!

The Owner, Architect, General Contractor, Printer, or PlanRoom will not be responsible for bids or sub-bids based on single drawings, specification sheets or observation or use of partial sets of documents. It is the bidder’s sole responsibility to review & understand all project requirements prior to submitting a bid!

Planroom Help? eMail support@blueprintfdl.com or call 920-922-3592.