Apr 17
Bid ended
HVAC AND CONTROLS UPGRADE WISCONSIN VETERANS HOME – KING
In general the work consists of replacement of pneumatic control equipment with low voltage DDC controls in Ainsworth Hall and the Marden Center.
All Specs | 2-1-24
(click to expand/collapse)
526-8.5x11.
Name | Date | Size | ||
VOL#1 STC SPEC_Veterans Home King HVAC | 2/1/2024 | 7.3 MB |