May 6
Bid ended

UW River Falls Agricultural Building Lab Renovations REBID

Remodel
In general, the work consists of: renovation of instructional laboratory/classrooms and support spaces within the Agricultural Engineering Building. Renovation scope includes laboratory gypsum and concrete masonry unit walls, doors, casework, ceilings and finish upgrades, roof infill and patching, air handling unit and make-up air replacement, fume hood, plumbing, power, and technology upgrades.
ADD1MEPID &ADD2| 04-29-2025 (click to expand/collapse)
20-8.5x11 in (2) pdf files.
Order this section for $0.00
This is available for download to registered users. Log in now
Name Size
23F3VREBID-00-SD-Addendum 1 MEPID 645.5 KB
23F4VREBID-00-SD-Addendum 2 476.2 KB