May 13
Bids in
5 days

UW Milwaukee Chemistry Building Site Restoration & Quad Construction

Site Work
In general, the work consists of: The Campus Quad site restoration and quad construction will replace the existing Chemistry Building after its demolition and become a premier destination for events, gathering, studying, and passive recreation in the heart of the Southwest Quadrant of the UW Milwaukee campus. This portion of the project will include regrading, installation of grass, shrubs, and trees along with installation of sidewalks, concrete benches, underground site drainage, site fencing, artificial turf, and both concrete and brick retaining wall construction. The project also includes installation of lighting and power outlets in the campus quad area, fire hydrant relocations, storm sewer and video surveillance.
ADD1 | 4-22-25 (click to expand/collapse)
10-8.5x11/6-30x42
Order this section for $10.00
This is available for download to registered users. Log in now
Name Size
24L1H-02-SD-Addendum 1 4.4 MB
ADD2MEPID|5-6-2025 (click to expand/collapse)
5-8.5x11
Order this section for $0.00
This is available for download to registered users. Log in now
Name Size
24L1H-02-SD-Addendum 2 MEPID 1.3 MB