Apr 30
Bid ended
Freedom Middle and High School Addition and Remodel - Bid Package #2
Bid Package #2 – All Divisions/Remaining Work. (BID PK 1 was Site/Demo and Foundation.)
ADD1 | 4-23-25
(click to expand/collapse)

145-8.5x11 & 196-30x42 in (11) files.
Name | Size | ||
08 71 00 Door Hardware_ADD #1 | 242.5 KB | ||
09 91 00 painting_ADD #1 | 147.5 KB | ||
11 40 00 Foodservice Specs Add 1 | 1.1 MB | ||
25-0417 Prebid Walk Thru Sign In | 298.2 KB | ||
26 05 03 special components ADD-1 | 198.4 KB | ||
26 05 35 electrical boxes ADD-1 | 105.1 KB | ||
26 32 00 natural gas generator ADD-1 | 322.9 KB | ||
27 51 25 public address system ADD-1 | 439.0 KB | ||
28 33 24 wireless clock system ADD-1 | 237.8 KB | ||
3629 Freedom ASD_Bid Package #2_Addendum 1_Drawings | 98.5 MB | ||
3629 Freedom ASD_Bid Package No. 2_Addendum 1_Narrative | 2.8 MB |
ADD2 | updated 4-28-25
(click to expand/collapse)

97-8.5x11 & 29-30x42 in (8) files.
Name | Size | ||
26 05 03 special components ADD-2 | 27.5 KB | ||
27 51 25 public address system ADD-2 | 62.0 KB | ||
28 24 00 door access control ADD-2 | 31.3 KB | ||
28 33 24 wireless clock system ADD-2 | 237.7 KB | ||
3629 Freedom ASD_Bid Package No. 2_Addendum 2_Drawings | 23.8 MB | ||
3629 Freedom ASD_Bid Package No. 2_Addendum 2_Narrative | 571.6 KB | ||
Freedom Pre-Bid RFI log 25-0422 - Responses 04.25.2025 | 183.1 KB | ||
Updated Roof Core Report | 11.8 MB |