May 22
Bids in
14 days

Rebid - UW Madison Memorial Library Fire Protection Retrofit & Renovations

Remodel
In general, the work consists of replacing the halon clean agent system in Memorial Library with a new pre-action sprinkler system. The obsolete halon system serving the Special Collections Library will be replaced with zoned preaction systems released with aspirating smoke detection. Ceilings will be removed and restored to allow for demolition and installation of the fire suppression systems. New lighting will be provided where ceilings are replaced. The isolation valve on the combination riser/standpipe will be replaced and a 3” drain riser installed.
Vols 1-2 Specs | 4-07-25 (click to expand/collapse)
532-8.5x11 in 3 files.
Order this section for $110.00
Name Date Size
VOL#1 REBID GPC SPEC_UW Madison Memorial Library 4/7/2025 2.8 MB
VOL#1 REBID MEP SPEC_UW Madison Memorial Library 4/7/2025 2.9 MB
VOL#2 REBID SPEC_UW Madison Memorial Library 4/7/2025 3.6 MB