Jun 17
Bids in
40 days
Southern Wisconsin Health Services North Campus Utility Improvements
In general, the work consists of: This project will replace sections of the existing campus steam distribution system. This work includes approximately 4,000 feet of new steam and condensate piping in direct buried conduits, reconstructing four existing steam vaults as well as water, sanitary and storm replacements. The new steam vaults will include electrical power for lighting and sump pumps. Restoration will include resurfacing roadway/driveway, sidewalks, fence and landscape areas disturbed by utility upgrades.
All Plans | 4-25-25
(click to expand/collapse)

72-30x42.
Name | Date | Size | ||
PLANS_Southern WI Health Utility Impr | 4/25/2025 | 95.6 MB |