Sep 10
Bids in
20 days
Southern WI Department of Health Building 7 HVAC Improvements
In general, the work consists of: the replacement of entire HVAC systems in the building and attached corridors. Replacement of steam and condensate piping, replacement of air handling units, fans, ductwork, and controls. New HVAC includes air handling units, variable volume terminals, heating hot water system, chilled water piping, and DDC controls. Work also includes associated general construction work, new toilets, ceiling replacement, windows replacement, roofing replacement, plumbing, fire protection sprinkler system, lighting replacement, and electrical support work.
All Specs | 7-23-25
(click to expand/collapse)

1272-8.5x11 in (7) files.
Name | Date | Size | ||
VOL#1 AAC SPEC_Health Bldg 7 HVAC | 7/23/2025 | 2.5 MB | ||
VOL#1 GPC SPEC_Health Bldg 7 HVAC | 7/23/2025 | 4.1 MB | ||
VOL#1 MEP SPEC_Health Bldg 7 HVAC | 7/23/2025 | 4.1 MB | ||
VOL#2 SPEC_Health Bldg 7 HVAC | 7/23/2025 | 4.4 MB | ||
VOL#3 SPEC_Health Bldg 7 HVAC | 7/23/2025 | 2.7 MB | ||
VOL#4 SPEC_Health Bldg 7 HVAC | 7/23/2025 | 3.2 MB | ||
VOL#5 SPEC_Health Bldg 7 HVAC | 7/23/2025 | 7.9 MB |