Jan 22
Bids in
48 days
UW Green Bay Studio Arts Building 4th Floor Arts Lab Renovations
In general, the work consists of: The renovation of the UWGB studio arts building 4th floor visual arts lab.
All Plans | 12-02-25
(click to expand/collapse)
(click to expand/collapse)
51-24x36 in (1) file.
| Name | Date | Size | ||
| PLANS_UWGB Studio Arts 4th Floor Reno | 12/2/2025 | 6.6 MB |
