Feb 18
Bids in
37 days

UW Whitewater Greenhill Center of the Arts Music Classrooms & Practice Lab Improvements

Remodel
In general, the work consists of: acoustic improvements within the Center of the Arts Music Department, including upgrades to practice rooms, ensemble/classroom spaces, faculty instructional studios, a secondary wing of practice labs, and the recital hall.

Status

Accepting Bids

Prebid Date 1/13/26 10:00am
Sub Bid Date 2/4/26 1:00pm
Bid Date 2/18/26 1:00pm

Company & Contacts

State of WI, Department of Administration, Division of State Facilities
Jamie McCarthy  
(608) 261-7758

Location

Whitewater, WI

Please Submit Bids to The OWNER as indicated in the Spec Manual.

PRE-BID CONFERENCE: Non-mandatory pre-bid tour is scheduled for Tuesday, January 13, 2026, at 10:00 local time. Attendees will meet in the main lobby. It is encouraged that contractors attend. No verbal instructions or explanations will be given regarding the bid documents. Submit all questions to the A/E via email at bidderquestions@strang-inc.com

DESCRIPTION: In general, the work consists of: acoustic improvements within the Center of the Arts Music Department, including upgrades to practice rooms, ensemble/classroom spaces, faculty instructional studios, a secondary wing of practice labs, and the recital hall. Work includes selective interior demolition, reconstruction of wall assemblies, and installation of acoustic doors, ceilings, and flooring to enhance sound isolation and control. Existing restrooms are being renovated to provide ADA accessibility. Selective replacement of mechanical and electrical systems is included to support project areas. The renovation impacts approximately 57,305 square feet and is primarily limited to interior construction within an existing three story academic building of original masonry construction. Priority improvements address the practice labs, large ensemble classrooms, faculty instructional studios, and secondary practice rooms. Full implementation of the design will occur through phased construction across three floors of the building. Exterior work is limited to repairs associated with mechanical system upgrades. Selective civil work is included to relocate electrical equipment from inside the building to the exterior to support acoustic performance. Sustainable design strategies include material reuse where feasible and the selection of low-VOC finishes to support occupant health and environmental quality.


It is the bidder’s sole responsibility to review the “Addenda” tab during the bidding process for new postings!

The Owner, Architect, General Contractor, Printer, or PlanRoom will not be responsible for bids or sub-bids based on single drawings, specification sheets or observation or use of partial sets of documents. It is the bidder’s sole responsibility to review & understand all project requirements prior to submitting a bid!

Planroom Help? eMail support@blueprintfdl.com or call 920-922-3592.