Jun 10
Bid ended

Wisconsin DOT Fond du lac DMV HVAC Duct Work

Remodel
In general, the work consists of: demolition of the existing mechanical equipment, demolition of the existing mechanical equipment curb and underfloor plenum walls, selective demolition of existing air distribution, furnishment and installation of new mechanical equipment and required ductwork and piping, furnishment and installation of sump pump and required piping, furnishment and installation of sump pit lid and new concrete curbs for new equipment, furnishment and installation of new power for new mechanical equipment, relocation of existing controls and controls wiring, relocation of existing lighting, and relocation of existing ceiling grid.

Status

Bidding Closed

Prebid Date 5/21/25 9:00am
Bid Date 6/10/25 1:00pm

Company & Contacts

State of WI, Department of Administration, Division of State Facilities
Diane Erickson  
608-266-2306

Location

Fond du Lac WI.

Please Submit Bids to The OWNER as indicated in the Spec Manual.

PRE-BID CONFERENCE: A non-mandatory pre-bid tour is scheduled for May 21 at 9:00 am at the DMV Fond du Lac located at 833 S. Rolling Meadows Dr., Fond du Lac, Wisconsin 54937. It is encouraged that contractors attend. Please contact James R. Vander Zanden, 608-819-0178, vanderzanden@jdreng.com for additional information.


It is the bidder’s sole responsibility to review the “Addenda” tab during the bidding process for new postings!

The Owner, Architect, General Contractor, Printer, or PlanRoom will not be responsible for bids or sub-bids based on single drawings, specification sheets or observation or use of partial sets of documents. It is the bidder’s sole responsibility to review & understand all project requirements prior to submitting a bid!

Planroom Help? eMail support@blueprintfdl.com or call 920-922-3592.