UW Stevens Point 4th Avenue Corridor Utility Replacement

Site Work
In general, the work consists of: replacing approximately 1000 lineal feet of underground steam and pumped condensate lines and four new steam pits. Steam and pumped condensate laterals to Champions Hall, Science Building, and CPS will be upgraded. Install approximately 1200 lineal feet of primary and signal duct bank along side existing duct bank distribution system. Extend existing underground chilled water distribution system for approximately 900 lineal feet, upgrade chilled water lateral to CPS.

Status

Accepting Bids

Prebid Date 10/20/25 10:00am
Sub Bid Date 11/6/25 1:00pm
Bid Date 11/20/25 1:00pm

Company & Contacts

State of WI, Department of Administration, Division of State Facilities
Kate Gloede  
608-261-7758

Location

Stevens Point WI.

Please Submit Bids to The OWNER as indicated in the Spec Manual.

PRE-BID CONFERENCE: A non-mandatory pre-bid tour is scheduled for October 20, 2025 at 10am, meet at south entrance to Champions Hall. It is encouraged that contractors attend. Please contact Rob Otremba (robert.otremba@wisconsin.gov) for additional information.


It is the bidder’s sole responsibility to review the “Addenda” tab during the bidding process for new postings!

The Owner, Architect, General Contractor, Printer, or PlanRoom will not be responsible for bids or sub-bids based on single drawings, specification sheets or observation or use of partial sets of documents. It is the bidder’s sole responsibility to review & understand all project requirements prior to submitting a bid!