Public Projects

Bids due tomorrow at 1:00pm
2/28/24 1:00pm
BOILER REPLACEMENT HEATING PLANT STANLEY CORRECTIONAL INSTITUTION
Bids due tomorrow at 1:00pm
State of WI, Department of Administration, Division of State Facilities
Stanley WI.
Remodel
In general, the work consists of: replacing the four hot water boilers with new energy efficient hot water boilers and PLC based controls. The work will also include replacement of boiler support systems and a new distribution header to the underground distribution supply and return piping.
Bids due tomorrow at 1:00pm
2/28/24 1:00pm
NORWALK ONTARIO WILTON Additions and Renovations BP3
Bids due tomorrow at 1:00pm
Market & Johnson - La Crosse
28861 WI 131, Ontario WI 54651.
Addition
In general, the project consists of an approximately 38,000 SF addition on the south side of the building. As part of this addition there will be approximately 9,140 SF designated as a FEMA shelter. The 2nd addition located on the east side of building #2 will serve as a concession stand for the new athletic facility that was previously bid as part of bid pack #1. The balance of the project will consist of remodeling the interior of the existing building including but not limited to renovated science rooms, agricultural room, band room, choir room, tech ed room along with changing the one of the existing gymnasiums into a new auditorium/theater. The exterior work will consist of new parking, curb & gutter, site utilities, sidewalks, fencing, retaining walls, and landscaping.
Bids due tomorrow at 2:00pm
2/28/24 2:00pm
SOMERSET STADIUM RENOVATION
Bids due tomorrow at 2:00pm
Market & Johnson - Stillwater MN
645 Sunrise Drive, Somerset WI 54025.
Site Work
This project consists of bleacher, press box and track and field upgrades.
Bids due in 2 days
Sub Bid: 2/15/24 1:00pm
Bid: 2/29/24 1:00pm
NEW HEALTH SERVICES UNIT AND RESTRICTIVE HOUSING UNIT EXPANSION WISCONSIN SECURE PROGRAM FACILITY
Bids due in 2 days
State of WI, Department of Administration, Division of State Facilities
Boscobel WI.
Addition
In general, the work consists of: the construction of a new Health Services Unit (HSU) addition and remodel the existing HSU to expand the restrictive housing unit (RHU) Program space.
Bids due in 2 days
2/29/24 2:00pm
ECASD North HS & Memorial HS Turf Project
Bids due in 2 days
Market & Johnson - Eau Claire
Eau Claire, WI 54703.
Site Work
In general, the project consists of constructing artificial turf playing fields at North and Memorial High Schools in Eau Claire, WI. Work includes site demolition, excavation, utilities, asphalt pavement, site concrete, fencing, electrical, synthetic turf, and bleacher systems.
Bids due in 2 days
2/29/24 2:00pm
ROSENDALE BRANDON ELEMENTARY SCHOOL & ROSENDALE BRANDON MIDDLE/HIGH SCHOOL
Bids due in 2 days
CD Smith Construction
Rosendale WI.
Addition
Additions & Renovations to the Elementary School & High School. This is a C.D. Smith Construction project. Estimated work start spring 2024. Two Projects & Two Separate Bids. Separate bid forms for each project will be sent out with first addendum/notice.
Bids due in 7 days
3/5/24 2:00pm
RIB MOUNTAIN METRO SEWERAGE DISTRICT PHASE II WWTP UPGRADES
Bids due in 7 days
CD Smith Construction
Wausau WI.
Remodel
Approximately 400 feet of new force main from the main pumping station to preliminary treatment building; installation of a new mechanical screen and wash press; rehabilitation of existing digester covers; replacement of aeration tank diffusers; plant HVAC upgrades; new non potable water system; new digester mixing system; new subgrade construction to house new gas safety and handling equipment; installation of a new waste gas burner; new generator; and other miscellaneous equipment replacement.
Bids due in 8 days
3/6/24 10:00am
DENMARK WWTF
Bids due in 8 days
CD Smith Construction
Denmark WI.
New Construction
New facility.
Bids due in 13 days
3/11/24 10:00am
Marshfield Wastewater Treatment Plant Tertiary Filtration and Biosolids Improvements
Bids due in 13 days
Market & Johnson - Eau Claire
2601 East 34th street, Marshfield WI 54449.
New Construction
The Project includes the following Work: New tertiary filtration building and chemical addition tanks, Biosolids Control Building addition to house a new gravity belt thickener, oxidation ditch submersible mixers, new effluent flow structure channel and flume, HVAC and mechanical system upgrades, all related mechanical and electrical work, and site and site roadway improvements.
Bids due in 15 days
3/13/24 1:00pm
LAKESHORE TECHNICAL COLLEGE
Bids due in 15 days
Somerville Inc
Cleveland WI
Remodel
Building L - Elevator Upgrades and Decommission.