Public Projects

Bids due in 3 days
10/21/25 1:00pm
Fox Valley Building Repairs
Bids due in 3 days
Capelle Bros & Diedrich Inc
Statewide WI.
Remodel
Various WI State Park Renovations.
Bids due in 4 days
Sub Bid: 10/8/25 1:00pm
Bid: 10/22/25 1:00pm
UW Whitewater Winther & Heide Hall Entry Additions & Renovations
Bids due in 4 days
State of WI, Department of Administration, Division of State Facilities
Whitewater WI.
Addition
In general, the work consists of: completely renovating Winther Hall including roofing and window replacement. New entrances, vertical circulation towers and restroom towers will be constructed. Heide Hall will receive a new entrance addition along with vertical circulation and restroom tower. The existing roofing and windows of Heide Hall will be replaced. Site work around Winther Hall and Heide Hall will be reworked to accommodate new additions and grades. Parking Lot 14, near Winther Hall, and Parking Lot 13 will be reworked to accommodate new construction.
Bids due in 5 days
10/23/25 10:00am
Electronic bidding
The Town of NEWTON FIRE DEPARTMENT
Bids due in 5 days
Keller, Inc.
Manitowoc WI.
New Construction
New Construction of a Fire Department Facility.
Bids due in 10 days
10/28/25 2:00pm
Birchwood SD Storage Building, Birchwood WI
Bids due in 10 days
Market & Johnson - Eau Claire
300 S Wilson Street, Birchwood, WI 54817
Addition
In general, the project consists of a new 15,000 sf single story front entrance addition and comprehensive remodel of the existing school. Work is to start in spring of 2026 with a late summer completion 2026.
Bids due in 12 days
10/30/25 2:00pm
City Of FDL Police Dept Remodel PH7.5
Bids due in 12 days
City of Fond du Lac
Main & Rees Streets, Fond du Lac WI.
Remodel
General Contractor to complete: Renovations and construction of main lobby and public restrooms. Provide an alternate bid for replacing main lobby front doors.
Bids due in 17 days
11/4/25 9:00am
Grand Court Apartments Kitchen Lighting Replacement Project
Bids due in 17 days
Fond du Lac Housing Authority
630 W Arndt Street, Fond du Lac WI 54935.
Mechanical
This work is to include replacing the exiting fluorescent kitchen light with a surface LED type in 31 living units in the two-story apartment building.
Bids due in 19 days
11/6/25 1:00pm
Governor Dodge State Park Road & Campground Improvements
Bids due in 19 days
State of WI, Department of Administration, Division of State Facilities
Dodgeville, WI
Site Work
In general, the work consists of: This project will repave portions of multiple roads and parking areas throughout Governor Dodge State Park. Repaving includes: Ridge Road from Twin Valley Road to Cox Hollow Road, Hickory Ridge Road and parking areas, Enee Point Parking Lot, and the Cox Hollow Boat Launch. This project will also replace aging and failing waterlines in the Twin Valley Campground, and construct a new parking area as part of this project at Smith Conley Creek, south of the park on CTH H.
Bids due in 19 days
11/6/25 2:00pm
Horicon WWTF
Bids due in 19 days
C.D. Smith Construction
Horicon WI.
Remodel
Upgrades to the wastewater treatment process.
Bids due in 24 days
11/11/25 1:00pm
Potawatomi State Park Paving & Utilities Replacement
Bids due in 24 days
State of WI, Department of Administration, Division of State Facilities
Town of Nasewaupee, WI
Site Work
In general, the work consists of: site clearing and grubbing, pulverizing asphalt pavement, removing asphalt pavement, excavation, rock excavation, grading, removing and replacing culvert pipes, installation of seasonal water service line, connections of water service line to existing pump, installation of new water pressure pump and treatment system, placing base course material as necessary for excavation below subgrade, placing base aggregate and asphalt pavement, pavement marking, permanent signing, site restoration, and other miscellaneous items of work.
Bids due in 33 days
11/20/25 1:00pm
Hill Farms State Office Building 7th Floor North Remodel
Bids due in 33 days
State of WI, Department of Administration, Division of State Facilities
Madison, WI
Remodel
In general, the work consists of: Interior renovation to 9,100 square feet. Demolition of drywall partitions with doors and hollow metal frames. Other work includes plywood monitor mounts, removal and reinstallation of plastic laminate casework with modifications, acoustic ceiling system modifications to accommodate new layout and access work above ceiling. Partitions are metal stud and drywall with wood doors in hollow metal frames with glass lites. Finish work includes wall base, carpet tiles, corner guards, casework modifications, and ceiling tiles. Electrical removal and installation of power and data sensors to accommodate renovation layout. Ceiling work includes removal and reinstallation or new light fixtures, exit lights, occupancy sensors, fire alarms, smoke detectors. Mechanical work includes duct and piping modifications, new VAVs equipment, relocation or new supply diffusers and return grilles. Fire protection work is piping modifications, removal and relocation of sprinkler heads, new sprinkler heads to accommodate renovation layout.